|
SECTION H -- LIBRARIES
TEN-YEAR HISTORY - DEPARTMENT OF LIBRARIES
|
|
FY 1997
|
FY 1998
|
FY 1999
|
FY 2000
|
FY 2001
|
FY 2002
|
FY 2003
|
FY 2004
|
ADOPTED
FY 2005
|
PROPOSED
FY 2006
|
|
|
|
|
|
|
|
|
|
|
|
|
AUTHORIZED
POSITIONS
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
PERMANENT
|
|
|
|
|
|
|
|
|
|
|
|
Full-Time
Equivalents
|
121.9
|
122.5
|
121.5
|
129.5
|
130.7
|
130.7
|
131.7
|
132.4
|
132.4
|
134.0
|
|
TEMPORARY
|
|
|
|
|
|
|
|
|
|
|
|
Full-Time
Equivalents
|
24.4
|
23.8
|
25.8
|
25.8
|
25.6
|
25.6
|
24.1
|
23.4
|
23.4
|
21.8
|
|
GRANT FUNDED
|
|
|
|
|
|
|
|
|
|
|
|
Full-Time
Equivalents
|
-
|
-
|
-
|
-
|
-
|
-
|
-
|
-
|
-
|
-
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
TOTAL FULL-TIME
EQUIVALENTS
|
146.3
|
146.3
|
147.3
|
155.3
|
156.3
|
156.3
|
155.8
|
155.8
|
155.8
|
155.8
|
|
|
|
|
|
|
|
|
|
|
|
|
EXPENDITURES
(000s)
|
8,737
|
8,547
|
8,947
|
9,579
|
9,919
|
10,215
|
10,532
|
11,291
|
11,720
|
11,928
|
|
|
|
|
|
|
|
|
|
|
|
|
REVENUES (000s)
|
|
|
|
|
|
|
|
|
|
|
|
Fees
|
510
|
449
|
439
|
507
|
561
|
450
|
429
|
470
|
472
|
479
|
|
Grants
|
263
|
232
|
246
|
260
|
391
|
388
|
224
|
216
|
216
|
209
|
|
|
|
|
|
|
|
|
|
|
|
|
TOTAL REVENUE
(000s)
|
773
|
680
|
685
|
767
|
952
|
838
|
653
|
686
|
688
|
688
|
|
|
|
|
|
|
|
|
|
|
|
|
NET TAX SUPPORT
(000s)
|
7,964
|
7,867
|
8,262
|
8,812
|
8,967
|
9,377
|
9,879
|
10,605
|
11,032
|
11,240
|
PROGRAM HISTORY - DEPARTMENT OF LIBRARIES
|
FY 1997:
|
Doubled
fines for adult and children materials from $.10 to $.20 and increased the
maximum rate per item from $5 to $8.
Also increased the maximum overdue fine amount for videos to $10 and
the service charge for interlibrary loan materials from $1 to $3 per
item. An overall increase of $145,000
will be used to increase the materials budget by the same amount.
|
|
Upgraded
the Integrated Information System to make available more advanced electronic
services for both the public library and public school customers including a
children's catalog with graphical users interface and periodical indexing
with full text and patron initiated reserves.
|
|
|
|
FY 1998:
|
Instituted
a new fee at $.10 per page for printing materials from the library
information system and the CD-ROM LAN.
|
|
|
|
FY 1999:
|
Provided
additional funding to support outreach services ($22,000, 2.0 FTEs) at
four sites.
|
|
Information
and Referral Unit restructured and 1.0 FTE transferred to DHS to assist
with their information and referral services.
|
|
|
|
FY 2000:
|
Provided
funding ($55,230) to upgraded six Student Aide FTEs to temporary Library
Assistant FTEs.
|
|
Provided
funding ($95,460) and 1.0 FTE to create a Cyber Center at the Columbia
Pike Library.
|
|
Provided
funding ($25,000) to upgrade the County homepage.
|
|
Transferred
Channel 31, the County Homepage and the digital photographic project
(7.0 FTE and $546,442 operating costs) from the County Manager's Office
to the Library Department.
|
|
|
|
FY 2001:
|
Added
$230,493 and 1.0 FTE (transferred from DTS) for the web-based
applications program.
|
|
Added
$55,000 to support full operating costs of the County's webpage.
|
|
Reduced
DTS expenditures $226,791 reflecting the elimination of DTS charges for data
processing and personal computers as part of the transition of DTS from an
internal service fund to a general fund department.
|
|
|
|
FY 2002:
|
Began
major redevelopment of County Website.
|
|
Moved
the Shirlington Library to an interim location, while the new co-located
library site is designed and built.
|
|
Completed
Master Plan for Westover/Reed site.
|
|
|
|
FY 2003:
|
Unfroze
a Student Aide position (1.0 FTE) and converted it to an Assistant Webmaster
position.
|
|
Eliminated
a frozen Library Assistant I position (0.5 FTE).
|
|
Two
limited term positions (Program Analyst II and Library Assistant I) ended.
|
|
Three
LANRU technology positions converted to Information Systems Analyst I
positions.
|
|
Credit for turnover was increased by
$8,538 making the total $118,103.
|
|
Fees for holds on materials eliminated.
|
|
$10,000 added to fund furniture
replacement schedule.
|
|
$35,000 added to library materials
budget.
|
|
|
|
FY 2004:
|
Information
Systems Analyst III position converted to a Communications Division Chief
position responsible for managing the County Website, Arlington Virginia
Network 71, and the Information and Referral Service.
|
|
$40,270
removed from materials budget to off-set State Aid to Libraries reduction.
|
|
One
full-time Library Assistant I position split into two part-time Library
Assistant I positions.
|
|
Two
part-time Librarian I positions merged to create one full-time Librarian I
position.
|
|
Library
Assistant I position was converted into a Security Guard II position to
provide 40-hour security coverage at Central Library.
|
|
Transferred
$10,000 photography budget to the County's Communications Office in FY 2003
Closeout.
|
|
|
|
FY 2005:
|
Added
$35,673 for Library materials.
|
|
Added
$23,039 for rental cost of Shirlington Library.
|
|